These Are The Road Construction Spots To Watch This Week
August 20, 2023
Drivers will encounter traffic disruptions on the following state roads in Escambia and Santa Rosa counties as crews perform construction and maintenance activities.
Escambia County:
- Interstate 10 (I-10) Escambia County Welcome Center – The truck parking lot at the Escambia County Interstate 10 Welcome Center, located at mile marker four, will be temporarily closed until fall when the Welcome Center improvements are scheduled to be complete. The front and middle car parking lots are open.
- East Nine Mile Road (U.S. 90A) Roadway Improvements from Chemstrand Road to east of Baldridge Drive – The bicycle lanes are temporarily closed to allow crews to widen the turn lanes and construct new five-foot bicycle lanes. In addition, the speed limit has been reduced from 45 mph to 35 mph as vehicles and bicycles share the roadway. The closure and speed limit reduction will be in place until the project is complete later this summer.
- U.S. 29 (North Century Boulevard) Resurfacing between Henry Street and Cottage Street in Century – Northbound and southbound traffic on U.S. 29 (North Century Boulevard) is shifted to one outside travel lane in each direction between Rudolph Street and Green Street. The shift will be in place through August as crews perform drainage improvements. Signage will be in place to safely direct drivers through the work zone.
- Sorrento Road (State Road (S.R. 292) Resurfacing from the Theo Baars Bridge to Bauer Road - Drivers may encounter intermittent lane closures, between Theo Baars Bridge and Bauer Road, Sunday, Aug. 20 through Thursday, Aug. 24 from 8 p.m. to 5:30 a.m. as crews place pavement markings on the roadway.
- Lillian Highway (S.R. 298) Resurfacing from north of U.S. 98 to east of Fairfield Drive (S.R. 727) and Lillian Highway at Blue Angel Parkway (S.R. 173) - Drivers will encounter alternating daytime lane closures on Lillian Highway, between U.S. 98 and Blue Angel Parkway, Sunday, Aug. 20 through Thursday, Aug. 24 from 6 a.m. to 8 p.m. as crews perform drainage work. In addition, drivers will encounter alternating lane closures, between Fairfield Drive and Blue Angel Parkway, from 8 p.m. Thursday, Aug. 24 to 6 a.m. Friday, Aug. 25 as crews pave the roadway.
- County Road (C.R.) 4 over Canoe Creek Bridge – C.R. 4, between Byrneville and Bratt, will be closed through fall 2024 as crews replace the Canoe Creek bridge. Traffic is directed through a 5.6-mile detour using Bratt Road to Pine Barren Road, then back to C.R. 4.
- North Palafox Street (U.S. 29/S.R. 95) Resurfacing from Cervantes Street (S.R. 10A) to Brent Lane (S.R. 296) – Drivers may encounter alternating lane closures between Cervantes Street and Brent Lane Sunday, Aug. 20 through Thursday, Aug. 24 from 8 p.m. to 6 a.m. Crews will be performing sidewalk work.
- U.S. 98 Pensacola Bay Bridge Replacement – Drivers may encounter alternating lane closures on the Pensacola Bay Bridge Sunday, Aug. 20 through Saturday, Aug. 26 from 8 p.m. to 5 a.m. as crews work on the lighting system. On Tuesday, Aug. 22, U.S. 98 westbound (Gulf Breeze to Pensacola) will have lane closures beginning at 10 p.m. due to Bands on the Beach.
- Mobile Highway (U.S. 90) Resurfacing from Nine Mile Road (U.S. 90A) to west of Pine Forest Road (S.R. 297) – Drivers may encounter lane closures, between Nine Mile Road and Pine Forest Road, Sunday, Aug. 20 to Friday, Aug. 25 from 7 p.m. to 6 a.m. each night as crews mill and pave the roadway.
- Routine Underground Utility Maintenance – Motorists will encounter alternating lane closures Tuesday, Aug. 22 through Saturday, Sept. 2 from 7 p.m. to 5 a.m. for manhole rehabilitation at the following locations:
- S.R. 291 (North Davis Highway) east of Lloyd Street
- U.S. 90 (West Cervantes Street) at North Reus Street intersection
- U.S. 90 (West Cervantes Street) at North Coyle Street intersection
- U.S. 98 (West Garden Street) at North Donelson Street intersection
- SR 292 (North Pace Boulevard) at West Wright Street, West Belmont Street, West Strong Street, West La Rua Street, West Jackson Street, U.S. 90 (West Cervantes Street), and West Gadsden Street intersections.
- S.R. 289 (9th Avenue) Routine Underground Utility Maintenance near Tippin Avenue – Motorists will encounter alternating lane closures Wednesday, Aug. 23 from 6 p.m. to 6 a.m. for routine maintenance on a gas line.
Santa Rosa County:
- U.S. 98 Pensacola Bay Bridge Replacement - Drivers may encounter alternating lane closures on the Pensacola Bay Bridge Sunday, Aug. 20 through Saturday, Aug. 26 from 8 p.m. to 5 a.m. as crews work on the lighting system. On Tuesday, Aug. 22, U.S. 98 westbound (Gulf Breeze to Pensacola) will have lane closures beginning at 10 p.m. due to Bands on the Beach.
- U.S. 98 (S.R. 30/Gulf Breeze Parkway/Navarre Parkway) Resurfacing of specific areas from Abercrombie Road to Calle De Palencia Street - Drivers on U.S. 98 (Navarre Parkway), between S.R. 87 and Calle De Palencia Street, may encounter intermittent lane closures from 8:30 p.m. to 5:30 a.m. as crews perform construction activities.
- U.S. 98 Widening from Bayshore Road to Portside Drive – Motorists will encounter the following traffic impacts:
- Median and turn-lane closures from Bayshore Road to Tiger Point Drive.
- Intermittent lane closures and additional median closures between Tiger Park Lane and Bayshore Road Sunday, Aug. 20, through Friday, Aug. 25, from 9 p.m. to 5:30 a.m. for stormwater drainage improvements and paving operations.
- I-10 Resurfacing from S.R. 281 (Avalon Boulevard) to east of S.R. 87 – Motorists will encounter nighttime east and westbound lane closures Monday, Aug. 21 and Thursday, Aug. 24 from 8 p.m. to 5 a.m. for paving operations.
- U.S. 90 Bridge Replacement over Simpson River – The outside (right) lane of U.S. 90 eastbound on the Simpson River Bridge will be closed Monday, Aug. 21 and Thursday, Aug. 24 from 8 p.m. to 5:30 a.m. Crews will be placing concrete for the new bridge. Drivers are reminded that the speed limit is 35 mph through the work zone.
- U.S. 98 Turn Lane Construction West of Tiger Lake Drive – Motorists will encounter intermittent southbound lane closures Monday, Aug. 21 through Sunday, Aug. 27 for the constructing of a new turn lane.
All activities are weather dependent and may be delayed or rescheduled in the event of inclement weather.
Comments
3 Responses to “These Are The Road Construction Spots To Watch This Week”
What about Detroit
“What about longleaf, bridge and road?”
Longleaf bridge is open. It’s not listed because these are all state roads, and Longleaf is not.
What about longleaf, bridge and road??????????????????????/