Drivers will encounter traffic disruptions on the following state roads and projects in Escambia and Santa Rosa counties as crews perform construction and maintenance activities.

Escambia County:

  • U.S. 29 Widening from Interstate 10 (I-10) to Nine Mile Road (State Road (S.R.) 10/U.S. 90A)– Drivers will experience the following impacts to traffic Sunday, Sept. 22 through Saturday, Sept. 28:
    • Nine Mile Road at the U.S. 29 Overpass: Alternating east and westbound lane shifts as crews construct the new southbound bridge, end bend, and center pier.
    • U.S. 29 traffic between I-10 and 9 ½ Mile Road may experience alternating lane closures as crews continue drainage and paving operations.
  • ·         U.S. 98 (Pensacola Bay Bridge) Replacement- Bridge construction may require the following lane closures from 8 p.m. to 5 a.m. the week of Sunday, Sept. 22.
    • ·         S.R. 291 (N. Davis Highway) Pavement Repairs near Navy Federal Credit Union- Northbound traffic will be restricted to one lane north of Brent Lane from 8 p.m. Tuesday, Sept. 24 to 5 a.m. Wednesday, Sept. 25 as crews remove the existing driveway and place curb and gutter.
    • ·         S.R. 10A (Mobile Highway) Routine Maintenance at Shoemaker and North Z street- East and westbound traffic will encounter intermittent and alternating lane restrictions from 8 p.m. Wednesday, Sept. 25 to 5 a.m. Thursday, Sept. 26 as crews make repairs to the road.
    • ·         U.S. 29 Resurfacing from south of Muscogee Road (County Road/C.R. 184) to Atmore Highway (S.R. 97) – North and southbound traffic may encounter intermittent daytime lane restrictions as crews perform median work.  Motorists are reminded to watch for crews and heavy equipment entering and exiting the roadway.
  • ·         U.S. 90 (Nine Mile Road) Widening from Beulah Road to S.R. 297 (Pine Forest Road)- There will be intermittent westbound lane closures between the I-10 interchange and the new bridge over Eleven Mile Creek from 8 p.m. to 5 a.m. the week of Sunday, Sept. 22 as crews pave for roadway widening.   Once work is complete, westbound traffic will be merging from the outside to inside lane between I-10 and the Eleven Mile Creek bridge.
  • ·         C.R. 168 Bridge Replacement over Unnamed Branch in Northwest Century- Crews continue driving production piles. Traffic will remain shifted onto the special detour until the new bridge is constructed and reopened to traffic.
  • ·         Bratt Road Bridge Replacement over Canoe Creek- Bratt Road continues to be closed near Canoe Creek. Drivers on Bratt Road, west of the bridge, will be detoured to Pine Barren Road and C.R. 4.  Drivers east of the bridge will be detoured east on Bratt Road.  The project is anticipated to be complete summer 2019.
    • Intermittent east and westbound lane closures on U.S. 98 from North 14th Avenue in Pensacola to east of the Pensacola Bay Bridge in Gulf Breeze.
    • Intermittent lane closures on North 17th Avenue in Pensacola, between U.S. 98 and the CSX Railroad overpass (Graffiti Bridge).
  • Hanks Road Bridge Replacement over Breastworks Creek- Construction activities continue. The roadway is temporarily closed during construction. Drivers on Hanks Road, west of the bridge, will be detoured to C.R. 99 and C.R. 4.  Drivers east of the bridge will utilize Pine Barren Road.  The project is anticipated to be complete late 2019.

Santa Rosa County:

  • U.S. 98 Pensacola Bay Bridge Replacement Bridge- Bridge construction may require the following lane closures 8 p.m. until 5 a.m. the week of Sunday, Sept 22:
    • Intermittent east and westbound lane closures on U.S. 98 from North 14th Avenue in Pensacola to east of the Pensacola Bay Bridge in Gulf Breeze.
    • Intermittent lane closures on North 17th Avenue in Pensacola, between U.S. 98 and the CSX Railroad overpass (Graffiti Bridge).
  • S.R. 87 Sidewalk Repair from Vonnie Tolbert Road to Holley Point Road- There will be north and southbound intermittent outside lane restrictions from 9 a.m. to 3 p.m. until Monday, Sept. 23 as crews repair sidewalk.
  • S.R. 87 Pavement Markings Replacement- Traffic will encounter alternating and intermittent minor delays between Nicholas Lake Road and Vonnie Tolbert Road from 8 p.m. to 5 a.m. Sunday through Thursday until Tuesday, Dec. 31 as crews remove and replace pavement markings in the roadway. Law enforcement will be on site to direct traffic

All activities are weather dependent and may be delayed or rescheduled in the event of inclement weather. Drivers are reminded to use caution, especially at night, when traveling through a work zone and to watch for construction workers and equipment entering and exiting the roadway.