FDOT Weekly Traffic Alerts: Highway 29 And More

July 30, 2018

Drivers will encounter traffic disruptions on the following state roads in Escambia and Santa Rosa counties as crews perform construction and maintenance activities.

Escambia County:

  • U.S. 29 Widening from Interstate 10 (I-10) to U.S. 90 (Nine Mile Road) – Drivers traveling U.S. 29 and Nine Mile Road will encounter traffic pattern changes from 8 p.m. to 6 a.m. Sunday, July 29 through Saturday, Aug. 4.
    • Nine Mile Road at the U.S. 29 overpass: North and southbound traffic will be reduced to one lane in each direction. Alternating traffic shifts will direct all traffic onto the westbound or eastbound lanes as crews continue construction of the new center bridge deck. Nine Mile Road lane restrictions are Sunday through Friday.
    • U.S. 29 between I-10 and 9 1/2 Mile Road: Alternating lane closures as crews continue drainage and paving operations. U.S. 29 lane restrictions are Monday through Saturday.
    • Northbound traffic has been shifted onto the newly constructed bridge section as demolition efforts continue.

·         U.S. 29 Resurfacing between U.S. 90 and Muscogee Road – Paving operations continue between Muscogee Road and West 9 ½ Mile Road. Lane closures will be in effect from 8 p.m. to 6 a.m. Sunday, July 29 through Thursday, Aug. 2.

·         I-10 / U.S. 29 Interchange Improvements Phase I – The following traffic impacts are planned on I-10 and U.S. 29 near the interchange (Exits 10) from 8 p.m. to 6 a.m. Sunday, July 29 through Thursday, Aug.2.

o        Alternating east and westbound I-10 and north and southbound U.S. 29 lane closures.

o        The U.S. 29 on-ramps to I-10 eastbound will be intermittently closed. Traffic will be detoured on U.S. 29 to access I-10 eastbound.

o        Alternating lane closures on the I-10 westbound exit ramp to U.S. 29 north and south (Exit 10).

  • U.S. 98 Pensacola Bay Bridge Replacement – Alternating lane closures between 14th Avenue in Pensacola and Bay Bridge Drive in Gulf Breeze from 8 p.m. to 5 a.m. Sunday, July 29 through Sunday, Aug. 5 as crews perform construction activities.
  • U.S. 98 (Lillian Highway) Resurfacing from Perdido Bay Bridge to Dogtrack Road– Alternating lane closures east and westbound U.S. 98 from Perdido Bay Bridge to Dog Track Road from 8 p.m. to 5:30 a.m. Sunday, July 29 through Thursday, Aug. 3 as crews perform paving operations.
  • State Road (S.R.) 750 (Airport Boulevard) from S.R. 291 (Davis Highway) to S.R. 289 (9th Avenue) – Intermittent lane closures on Airport Boulevard east and westbound, between Davis Highway and 9th Avenue from 8 p.m. to 6 a.m. Sunday, July 29 through Thursday, Aug. 3 as crews perform construction activities.
  • S.R. 296 (W. Michigan Avenue) Routine Maintenance between Sun Valley Drive and Mobile Highway- The east and westbound, outside lane will be closed between Sun Valley Drive and Mobile Highway from 9 a.m. to 3 p.m. Wednesday, Aug. 1 through Saturday, Aug. 4 as crews trim tree limbs around utility lines.

Santa Rosa County:

  • I-10 Widening from Escambia Bay Bridge to S.R. 281 (Avalon Boulevard/Exit 22) – Alternating lane closures on I-10, from the Escambia Bay Bridge to east of Avalon Boulevard, from 8 p.m. to 6 a.m. Sunday, July 29 through Friday, Aug. 3 as crews work to widen the roadway. In addition, alternating lane closures on Avalon Boulevard, near the I-10 interchange, will also be encountered as crews reconstruct the travel lanes.   
  • U.S. 98 Pensacola Bay Bridge Replacement – Alternating lane closures between 14th Avenue in Pensacola and Bay Bridge Drive in Gulf Breeze, from 8 p.m. to 5 a.m. Sunday, July 29 through Sunday, Aug. 5 as crews perform construction activities.
  • S.R. 87 Multilane from Eglin AFB boundary to Hickory Hammock Road – The following construction related traffic impacts are planned for S.R. 87 the week of Monday, July 30:
    • All four lanes between Eglin Air Force Base boundary and two miles south of the Yellow River will be opened to traffic.
    • Intermittent north and southbound lane closures, between the Eglin Air Force Base boundary and two miles south of the Yellow River, as crews perform construction activities.
    • Traffic between Hickory Hammock Road and the Eglin AFB boundary will continue to be restricted to loads less than 11-feet wide. The restriction will be in place until the project is completed.
  • S.R. 87 Landscape between U.S. 98 and River Road – Drivers can expect intermittent turn lane restrictions between U.S. 98 and River Road 9 a.m. to 3 p.m. Monday through Thursday as crews install landscape and irrigation.

Comments

Comments are closed.