Drivers will encounter traffic disruptions on the following state roads in Escambia and Santa Rosa counties this week as crews perform construction and maintenance activities.  

Escambia County:

  • State Road (S.R.) 750 (Airport Boulevard) from S.R. 291 (Davis Highway) to S.R. 289 (9th Avenue) – Intermittent eastbound lane closure near Davis Highway from 9 p.m. to 6 a.m. as crews install guardrail.
  • U.S. 29 Widening from I-10 to U.S. 90 (Nine Mile Road)- Drivers traveling U.S. 29 and Nine Mile Road will encounter traffic pattern changes from 8 p.m. to 6 a.m. Tuesday, May 29 through Saturday, June 2 as follows:
    • Nine Mile Road at the U.S. 29 overpass: North and southbound traffic will be reduced to one lane in each direction. Alternating traffic shifts will direct all traffic onto the westbound or eastbound lanes as crews continue construction of the new center bridge deck. Nine Mile Road lane restrictions are Sunday through Friday.
    • U.S. 29 between I-10 and 9 1/2 Mile Road: Drivers may experience alternating lane closures as crews continue drainage and paving operations. U.S. 29 lane restrictions are Monday through Saturday.
  • U.S. 29 Resurfacing between U.S. 90 and Muscogee Road - Alternating lane closures on U.S. 29 north and southbound, from Muscogee Road to West 9 ½ Mile Road, from 8 p.m. to 6 a.m. Tuesday, May 29 through Thursday, May 31 as crews pave the roadway.

·         I-10 / U.S. 29 Interchange Improvements Phase I- The following traffic impacts are planned on I-10 and U.S. 29 near the interchange (Exits 10) from 8 p.m. to 6 a.m. Tuesday, May 29 through Friday, June 1:

    • Alternating lane closures on I-10 east and westbound and U.S. 29 north and southbound.
    • The U.S. 29 on-ramps to I-10 eastbound will be intermittently closed. Traffic will be detoured on U.S. 29 to access I-10 eastbound.
    • Alternating lane closures on the I-10 westbound exit ramp to U.S. 29 north and south (Exit 10).

·         U.S. 98 Pensacola Bay Bridge Replacement- Alternating east and westbound lane closures between 14th Avenue in Pensacola and Bay Bridge Drive in Gulf Breeze from 8 p.m. to 5 a.m. Tuesday, May 29 through Thursday, May 31 as crews perform construction activities.

·         U.S. 98 (Lillian Highway) Resurfacing from Perdido Bay Bridge to Dogtrack Road – Construction activities are underway.  Lane restrictions may take place from 8 p.m. to 5:30 a.m. Tuesday, May 29 through Thursday, May 31.

·         U.S. 90 (Mobile Highway) Intersection improvement at County Road (C.R.) 99 (Beulah Road)- Work to improve the intersection of State Road 10A (Mobile Highway) at Beulah Road in Escambia County is scheduled to begin the week of Monday, May 21. To help minimize traffic impacts, much of the construction work will take place behind a low-profile concrete barrier wall. No lane closures will be allowed Monday through Friday from 6:30 a.m. to 8:30 a.m. or 1 p.m. to 3 p.m.  In addition, no lane closures will be scheduled during special school events.

Santa Rosa County:

  • U.S. 98 Pensacola Bay Bridge Replacement – Alternating east and westbound lane closures between 14th Avenue in Pensacola and Bay Bridge Drive in Gulf Breeze, from 8 p.m. to 5 a.m. Tuesday, May 29 through Thursday, May 31 as crews perform construction activities.
  • U.S. 98 Turn Lane Construction at Joybrook Road in Navarre- Drivers will encounter intermittent and alternating lane restrictions from 8 p.m. to 5 a.m. Tuesday, May 29 through Thursday, May 31 as crews pave turn and travel lanes at the intersection.
  • S.R. 87 Multilane from Eglin AFB boundary to Hickory Hammock Road – Intermittent lane shifts from 8 p.m. to 6 a.m.  the week of Tuesday, May 29 on S.R. 87 north and southbound between Eglin Air Force Base boundary and two miles south of the Yellow River.  Crews will be paving in the area. Additionally, traffic between C.R. 184 (Hickory Hammock Road) and the Eglin AFB boundary is restricted to loads less than 11-feet wide. The restriction will be in place until the project is complete.
  • I-10 Widening from Escambia Bay Bridge to Avalon Boulevard (S.R. 281/Exit 22) Alternating lane closures on I-10, from the Escambia Bay Bridge to east of S.R. 281 (Avalon Boulevard/Exit 22), from 8 p.m. to 6 a.m. Tuesday, May 29 through June 1 as crews work to widen the roadway.  In addition, alternating lane closures on Avalon Boulevard, near the I-10 interchange, will also be encountered as crews reconstruct the travel lanes.
  • U.S. 98 at Sunrise Drive Lane Closure- East and westbound traffic on U.S. 98 at Sunrise Drive will encounter lane restrictions from 8 p.m. Wednesday, May 30 to 5 a.m. Thursday, May 31 as crews install crosswalk pavement markings.

All activities are weather dependent and may be delayed or re-scheduled in the event of inclement weather. Drivers are reminded to use caution, especially at night, when traveling through a work zone and to watch for construction workers and equipment entering and exiting the roadway..

Pictured: A look at the Pensacola Bay Bridge construction as seen on Sunday. NorthEscambia.com photo by Kristi Barbour, click to enlarge.