FDOT: Weekly Traffic Alerts

March 25, 2017

Drivers will encounter traffic variations on the following state roads in Escambia and Santa Rosa counties as crews perform construction and maintenance activities.

Escambia County:

·      Nine Mile Road (State Road (S.R.) 10/U.S. 90A) from Beulah Road to Pine Forest Road Widening – Alternating lane closures between Interstate 10 (I-10) and the Navy Federal Credit Union from midnight Sunday, March 26  to 6 a.m. Monday, March 27 and from 8 p.m. to 6 a.m. Monday, March 27 and Tuesday, March 28 as crews install drainage. Traffic will be allowed in one direction at a time with traffic flaggers on hand to safely direct drivers through the work zone.

·      Interstate 10 (I-10)/ U.S. 29 Interchange Improvements Phase I – Drivers will encounter the following traffic impacts 8 p.m. to 6 a.m. Monday, March 27 through Thursday, March 30 as crews mill and resurfacing the roadway.

o    Alternating lane closures on I-10 westbound near U.S. 29 (Exits 10A and 10B).

o    The U.S. 29 north to I-10 westbound ramp will be closed. Traffic will be detoured north to make a U-turn at Broad Street to access I-10 westbound.

o    Intermittent lane closures on the I-10 westbound to U.S. 29 north ramp (Exit 10B). Traffic will be detoured to Exit 10A for access U.S. 29.

·      I-10 Widening from Davis Highway to the Escambia Bay Bridge - The right lane and shoulder of I-10 eastbound, between Scenic Highway (Exit 17) and Davis Highway (Exit 13), will be closed from 8 p.m. to 6 a.m. Monday, March 27 through Friday, March 31 as crews pave the right lane and shoulder. Scenic Highway (U.S. 90) southbound travel lanes, south of I-10, will be slightly shifted Wednesday, March 29 and Thursday, March 30 as crews apply pavement markings.

·      Bayfront Parkway (S.R. 196) 2017 Ciclovia Bike Event- Temporary closure from Spring Street to Cervantes Street , Cervantes Street to Scenic Highway, and Chipley Street to Summit Boulevard from 6:30 a.m. to 4:30 p.m. Saturday, March 25 for festivities.  Traffic will be detoured and local law enforcement on site to assist with traffic control.

·      U.S. 29 at North Tate School Road Turn lane construction in Gonzales - The northbound, outside lane will be closed from 8 p.m. to 5 a.m. Monday, March 27 through Thursday, March 30

as crews extend the southbound (left) turn lane, install a new northbound (right) turn lane, and construct a new driveway at Arby’s.

·         Perdido Key Drive (S.R. 292) Resurfacing from the Alabama State line to the ICWW (Theo Baars Bridge) – Drivers can expect minor delays Monday, March 27 through Friday, March 31 as crews stripe the roadway and complete miscellaneous construction activities on the project.  Drivers can expect delays.

·         Lillian Highway ( S.R. 298) over Mill View Bayou Bridge Maintenance- North and southbound lane restrictions from 8 p.m. Monday, March 27 to 5 a.m. Tuesday, March 28 as crews perform joint repair work on the bridge.  Drivers are reminded to watch for traffic flaggers.

·         Nine Mile Road (S.R. 10) south of Scenic Hills Drive Turn Lane Construction- Eastbound lane closure from 8 p.m. to 5 a.m. Monday, March 27 through Thursday, March 30 as crews construction right turn lanes for the Wal-Mark Market just east of Westside Drive.

·         New Warrington Spur (S.R. 727) over West Fairfield Drive (S.R. 295) Bridge Maintenance- Eastbound outside, right lane will be closed from 10 p.m. until midnight Monday, March 27 as crews perform joint repair work on the bridge.

·         Barrancas Avenue (S.R. 292) over Bayou Chico Routine Bridge Maintenance- East and westbound lane closures from 12 a.m. until 5 a.m. Monday, March 27 as crews clean bridge joints.

·         U.S. 29 (S.R. 95) Widening from I-10 to Nine Mile Road- Alternating lane closures continue from 8 p.m. to 6 a.m. on U.S. 29 between I-10 and 9 1/2 Mile Road and on Nine Mile Road near the U.S. 29/ Nine Mile Road overpass as crews perform drainage and bridge operations.

·         Nine Mile Road (S.R. 10/U.S. 90A) Widening from Pine Forest Road to U.S. 29- Alternating lane closures continue on Untreiner Avenue as crews perform jack and bore operations.

·         Fairfield Drive (S.R. 295) over the Railroad Tracks Routine Bridge Maintenance- East and westbound alternating lane closures from 8 p.m. until 5 a.m. Tuesday, March 28 and Wednesday, March 29 as crews replace bridge joints.

·         I-10 Escambia Bay Bridge Routine Maintenance- Eastbound lane closures from 8 p.m. Thursday, March 30 to 5 a.m. Friday, March 31 as crews perform routine maintenance on the bridge.

Santa Rosa County:

·         I-10 Resurfacing from S.R. 87 to the Okaloosa County Line- Intermittent and alternating lane restrictions from 8 p.m. to 6 a.m. from Monday, March 27 through Friday, March 31 as crews perform construction activities.

·         I-10 Widening from Escambia Bay Bridge to Avalon Boulevard (S.R. 281/Exit 22) – Alternating lane closures on I-10 east and westbound near Avalon Boulevard from 8 p.m. to 6 a.m. the week of Monday, March 27 as crews remove barrier wall.

Drivers are reminded to use caution, especially at night, when traveling through the construction zone, and to pay attention for workers and equipment entering and exiting the work area.