Century Reviews Preliminary List Of Streets For Resurfacing Project
May 19, 2010
Century is moving forward on plans to resurface some streets, with the town’s street superintendent developing a list of streets that most need attention.
“The list is food for thought right now,” Mayor Freddie McCall said. The town council will review and refine the list well before any work begins. McCall said that obtaining proper right of way will be an issue on several streets before any resurfacing.
The preliminary street resurfacing list includes:
- Freedom Road — heavy traffic
- Old Flomaton Road – north end from curve to railroad, heavy traffic
- Hecker Road — heavy traffic
- Elm Street — school bus traffic
- Hilltop Road — moderate traffic
Short streets or dead ends
- West Cottage Street
- Academy Street
- Pleasant Hill Road
- Ramar Street
- Curve on Lake Street
Dirt Roads
(all need drainage system before paving)
- Bonwell Lane
- Gifford Lane
- Barnwell Lane
- Field Road
- Sellers Road
- East Pond Street
Comments
3 Responses to “Century Reviews Preliminary List Of Streets For Resurfacing Project”
Larry and Mayor McCall
Be sure all these streets listed are within the cith limits. I’m not sure if Salters lake road is in the city limits or not and some othere are questionable.
What about alger
Salters Lake road needs paving from Hwy29 to the railroad tracks.